Assign Work Schedule
A 3-step recipe with Workday Tracking System. We can help you get access.
Recipe · 3 steps
Assign Work Schedule
Capture the current schedule, assign a new one, and confirm it.
- Read the worker's current work schedule assignment to capture the pre-change state.
- Import the new work schedule assignment for the worker.
- Read the worker's schedule effective as of the new assignment date to confirm the assignment took effect.
What you'll need to have ready
- workerId: The Workday ID of the worker.
- bearerToken: OAuth 2.0 JWT bearer token for authenticating with Workday.
- scheduleId: Workday ID of the schedule to assign.
- effectiveDate: Date the assignment becomes effective (YYYY-MM-DD).
- endDate: Optional end date for the assignment (YYYY-MM-DD).
For your developer
Arazzo workflow workday-tracking-system:assign-work-schedule, 3 operations: getWorkSchedule → assignWorkSchedule → getWorkSchedule. Specs on APIs.io.