Change a connector group's scheduled upgrade
One step with Palo Alto Networks. We can help you get access.
Get something done
Change a connector group's scheduled upgrade
with Palo Alto Networks · Cybersecurity Management
Use Palo Alto Networks: its ZTNA Connector Restful Connector Group API lets you change a connector group's scheduled upgrade in a single step (PUT /sse/connector/v2.0/api/connector-groups/{oid}/scheduled-upgrade). capabilities.work can help you get signed up and connected.
- How do I change the image or time of an upgrade already scheduled for a connector group?
- Can I switch an existing scheduled upgrade to a rolling upgrade?
Say it to your AI assistant
- Change the existing scheduled upgrade of connector group {oid} to image {image_id}.
- Reschedule the upgrade of group {oid} to image {image_id} at {scheduled_upgrade}.
For your developer
PUT /sse/connector/v2.0/api/connector-groups/{oid}/scheduled-upgrade in ZTNA Connector Restful Connector Group API. Full spec on APIs.io.